AI property feasibility research

Know what the
property allows.

Property feasibility, researched to a standard.

Masterlot combines AI-assisted research with independent QA to investigate the parcel, governing rules, site constraints, and viable project paths behind ADUs, homes, multifamily development, and backyard structures.

Book a Demo
24HReport delivery
guaranteed
MASTERLOT / RESEARCH PROTOCOL ILLUSTRATIVE
PARCEL RECORD RULE TRACE QA GATE
  1. 01Parcel truthSOURCE RECORD
  2. 02Rules + project pathsRESEARCH
  3. 03Independent reviewQA GATE
  4. 04Client-ready reportDELIVERY
Process model only. No address, project result, or approval is represented.
Primary sources AI-assisted analysis Named unknowns Independent QA

STANDARD / 01

Evidence is part of the deliverable.

AI accelerates collection, comparison, and synthesis. Load-bearing facts still need a source trail; judgment calls need visible confidence; unresolved items need a next step.

Research controls
Delivery guarantee
24Hreport delivery turnaround, guaranteed
18site and overlay fields in the ADU parcel-data contract
3independent audit rounds before gap closure and fact-check
01Parcel identity first

Jurisdiction, APN, zoning, geometry, and site evidence are resolved before recommendations.

INPUT GATE
02Source hierarchy

AI-assisted research starts with official records and primary legal sources—not uncited summaries.

EVIDENCE
03Contradictions investigated

Conflicting facts are resolved or elevated as a specific open question, never blended away.

RECONCILE
04Delivery audited

Report content, numbers, source coverage, and final PDF rendering receive a separate check.

OUTPUT GATE
Current public description · Updated August 30, 2026

Coverage is confirmed per engagement. Masterlot’s deepest current regulatory research coverage is in California.

RESEARCH PRODUCTS / 02

Four project types.
One research standard.

Each engagement starts with the property and the decision at hand. The research path changes by project type; the evidence and QA expectations do not.

01
ADU

AI-assisted ADU feasibility

Eligibility, AI-assisted zoning and ordinance research, governing pathway, setbacks, site fit, hazards, utilities, fees, and permitting sequence.

  • State + local rules
  • Geometry + siting
  • Permit actions
02
SFH

Primary residence & single-family

New build, addition, or teardown/rebuild research tied to the lot, development envelope, code route, and site constraints.

  • Project path
  • Buildable envelope
  • Decision gates
03
MF

Multifamily development analysis

Base zoning, incentives, density and FAR, envelope, policy pathways, financial assumptions, and comparative schemes.

  • 3+ schemes
  • Sensitivity checks
  • Risk register
04
SHED

Sheds & backyard structures

Permit thresholds, product dimensions, placement, fire and flood conditions, electrical scope, and submittal route.

  • Product-spec lock
  • Site placement
  • Permit scope

PROFESSIONAL WORKFLOWS / 03

Useful before a team commits.

Masterlot is designed to enter an existing professional workflow—not become another dashboard the team has to operate.

01

Modular & prefab manufacturers

Qualify the lot and product fit before the proposal hardens.

  1. ABefore the first site or sales review
  2. BWhen a model must be matched to real constraints
  3. CWhen the client needs a white-label decision brief
BEFORE QUOTING
02

General contractors

Bring zoning, site, fee, and agency questions into scope early.

  1. ABefore the site visit or budget conversation
  2. BWhen assumptions need named verification owners
  3. CWhen the bid needs a documented feasibility basis
BEFORE COMMITMENT
03

Investors & developers

Compare development paths and direct diligence to the sensitive facts.

  1. ABefore capital is committed to a site
  2. BWhen multiple legal or physical paths compete
  3. CWhen open risks need a diligence plan
BEFORE CAPITAL

Also useful for architects and serious property owners who need a research basis before design or application work begins.

RESEARCH + QA METHOD / 04

A research chain with gates—not a single pass.

AI-assisted collection and synthesis, interpretation, challenge, and delivery are separate jobs. Keeping them separate makes uncertainty visible and reduces confirmation bias.

Confirmed from a primary source Estimate, interpretation, or open item
  1. 01

    Establish parcel truth

    Confirm the jurisdiction, parcel identity, zoning, geometry, existing conditions, and relevant overlays from traceable records.

    COLLECT
  2. 02

    Trace the governing rules

    Resolve the applicable state and local pathways, effective dates, development standards, fees, and agency process.

    INTERPRET
  3. 03

    Compare viable project paths

    Test legal and physical options against the client’s decision, using deterministic geometry where a fit conclusion depends on measurements.

    MODEL
  4. 04

    Audit, close gaps, fact-check

    Run an independent review, investigate weak assumptions, exhaust resolvable gaps, and verify factual claims against their cited sources.

    CHALLENGE
  5. 05

    Deliver the decision record

    Separate confirmed facts, analysis, unknowns, and next actions in a client-ready report; then audit the final file for fidelity and presentation.

    DELIVER

CLIENT OUTPUT / 05

A report
designed to be
questioned.

The report gives the meeting a durable record: what is known, what it means for the project, which alternatives remain, and what must happen next.

  • 01Executive decision brief and recommended direction
  • 02Parcel, regulatory, site, and hazard evidence
  • 03Project paths, geometry, and comparative scenarios
  • 04Fees, process, risks, unknowns, and action owners
  • 05References and source index for follow-up

Professional teams: white-label report delivery is available as a supporting capability.

MASTERLOT
FEASIBILITY REPORT

ANONYMIZED REPORT STRUCTURE

Property feasibility
decision brief

No address or project outcome shown
01Executive summary 02Property overview 03Regulatory framework 04Site constraints + hazards 05Buildable area analysis
06Concept or development paths 07Fee analysis 08Permitting process 09Prioritized action items 10References + source index
Official-source fact Estimate or open item
Faithful anonymized structure drawn from current feasibility-report contracts. Section detail varies by project type.

FIELD FEEDBACK / 06

Research that moves into the client conversation.

Feedback originally provided for work delivered under ADU Pilot, the focused service that preceded Masterlot’s broader property-research scope.

“What would normally take us several days or weeks of research only took a couple of hours to generate.”

Christine HessJ. Carr Contracting

“ADU Pilot is very helpful. That’s exactly what we want to have done moving forward.”

Gregory WnorowskiCo-Founder, ADUJustForU

Past client feedback describes prior engagements and does not guarantee feasibility or project outcome.

PROFESSIONAL BOUNDARY / 07

Clear enough to act on.
Honest about authority.

MASTERLOT PROVIDES

Pre-application research, source synthesis, comparative feasibility analysis, decision support, and a documented next-action plan.

MASTERLOT DOES NOT REPLACE

A boundary or topographic survey, stamped architecture or engineering, an official agency determination, lender appraisal, legal opinion, or permit approval.

NO FEASIBILITY GUARANTEE

Rules, records, site conditions, and agency interpretations can change. Final siting and compliance must be confirmed by the responsible professionals and authorities.

DIRECT ANSWERS / 08

Frequently asked questions

Scope note: these answers describe Masterlot’s current property feasibility research service as of August 30, 2026.

What is property feasibility research?

It is a pre-application investigation of a property, the rules that govern it, the site constraints that affect it, and the realistic paths for a proposed project. The output supports an early decision; it is not an official approval.

What projects does Masterlot research?

Masterlot covers ADUs; primary residences and single-family new builds, additions, or rebuilds; multifamily development analysis; and sheds or other backyard structures. The opening conversation confirms the appropriate scope.

What does Masterlot need to start?

Bring the property address, the project you are considering, the decision the research needs to support, and any existing plans, surveys, title documents, product specifications, or agency correspondence you already have.

Which sources are used?

Research may use assessor and parcel records, city or county GIS, municipal and state law, agency handouts, hazard and environmental data, fee schedules, permit records, recorded maps, and project documents. The applicable source set depends on the property and question.

How does Masterlot use AI?

Masterlot uses AI-assisted research to collect and compare property records, zoning rules, site constraints, and project paths. Independent audit, gap closure, and final fact-checking remain separate quality gates. The result is a source-cited AI feasibility report—not an official agency determination.

How quickly will I receive the report?

Masterlot guarantees delivery of the agreed feasibility report within 24 hours after the required property and project inputs are received. The guarantee covers report delivery—not permit approval or a particular feasibility outcome.

Does the report guarantee that a permit will be approved?

No. Masterlot provides pre-application feasibility research. It does not issue agency determinations, stamp design documents, verify legal boundaries, or guarantee approval. The report identifies which conclusions require field, professional, title, utility, or agency confirmation.

Where does Masterlot work?

Coverage is confirmed case by case. The deepest current regulatory and parcel-research coverage is in California, with selected workflows available in other U.S. jurisdictions.

Can a professional firm use its own branding?

Yes. White-label delivery can support manufacturers, contractors, architecture firms, and other professional teams. Branding, scope, and client-facing boundaries are agreed before research begins.

How current is the research?

Sources and access dates are recorded for the engagement. Because laws, fees, maps, site conditions, and agency practice change, time-sensitive findings should be refreshed before a later application or capital decision.

START WITH THE PROPERTY

Bring the address.
Get the report in 24 hours.

Report delivery is guaranteed within 24 hours after the required inputs are received. See how source-cited AI feasibility research applies to your property.

Book a Demo